Operation and effect after reconstruction of waste heat recovery system

First, the operation of the waste heat recovery system


        After the transformation of the waste heat recovery system, it has been safely operated for nearly two years. No failure occurred, the energy saving effect is good, the exhaust gas temperature is lowered by 35~70 °C, the air preheater temperature is increased by 60~100 °C, and the furnace thermal efficiency is improved by 5~8. Percentage points. High-power heat pipe radiator


       

Second, economic benefits


        (1) After replacing the superheat pipe air preheater, the original preheating system is not required except for the drum and the draft fan, and the power system and the lubricating oil system are all unnecessary. The power saving fee is 4×RMB¥, and the operation and maintenance fee is saved 20×RMB. ¥.


        (2) In the past, the regenerator of the rotary preheater required the replacement of the regenerator. The spare parts need to be around 20×RMB¥, and the heat pipe generally does not need to be repaired within 5 years.


        (3) The use of the heat pipe preheater will effectively prevent dew point corrosion and ash blockage, thereby avoiding the preheating system removal caused by the preheater failure, thus producing better benefits.


        (4) The superconducting heat pipe preheater saves 1500t of fuel oil, equivalent to about RMB150×RMB¥. The payback period is only 8 months.